Application
Nano-tech
Project analysis
Customer feedback
Wuhan Tianxingzhou rail bridge
Building aspects:

The building was built in 2007, it was the No.2 largest highway railway bridge of the world when established, is transportation hub of highway and railway in China, the overall application of bridge concrete structure applied GRASi WP1321.


Quality requirements:
Prevent concrete steel bars from rust, corrosion, prevent the concrete structure from carbonation, improve the durability of concrete structure.
Grasi ,ion-mask and Aridion are trademarks of GRASI Limited.Other trademarks are the property of the respective trademark owners.
All products images and information probided on this website are the property of GRASI Ltd and may not be reproduced or used in an way without our permission.
Copyright © Shanghai GRASi Industry Co.,Ltd. All rights Reserved.  Technical Support£ºYi shang network